MAG Leather Factory

Badr City, Egypt


The project entailed the construction of some facilities, occupied an area of 4000 m² for the MAG Leather Factory, including a workshop, Administration Building, Guardhouse, Warehouse and temporary Labor Accommodation.

Scope of work

The complete structural design and drawings required for the erection of the required constructions for the MAG factory.

  • Project Area Industrial
  • Cost 3,000,000.00
  • SectorsStructural
Architecture is basically a container of something, i hope they will enjoy not so much the teacup, but the tea.
Yoshio Taniguchi