Badr City, Egypt
The project entailed the construction of some facilities, occupied an area of 4000 m² for the MAG Leather Factory, including a workshop, Administration Building, Guardhouse, Warehouse and temporary Labor Accommodation.
Scope of work
The complete structural design and drawings required for the erection of the required constructions for the MAG factory.
Architecture is basically a container of something, i hope they will enjoy not so much the teacup, but the tea.