Cairo, Egypt
The project constitutes a total of 110 feddans including facilities such as Administration Building, a Clinical Waste Treatment Plant, a Weighing Bridge, a Wheel Wash & a Machinery Wash, Water & Gasoline Tanks, a Generator, a Leachate Pool and a Workshop.
Scope of work
Construction Development Center team role was the production of the full structural, architectural, electrical and mechanical working drawings of all the buildings included within the plant, and the construction details of the landfill.
The exterior cannot do without the interior since it is from this, as from life, that it derives much of its inspiration and character.