Kabul, Afghanistan
This project entails all essential services required to sustain the two 500 man Improved Tented Camps (ITC) to accommodate for the British Army troops. These services will include Water Supply, Sewerage, Fire Hydrants and Communication Ducts.
Scope of work
CDC Scope of work is to Design of the Water Ringmain, Sewage System, Fire Hydrants and the Communication’s Pits and Ducts.
Architecture is a visual art, and the buildings speak for themselves.