Kara EPA ENI B Primary School Kara, Togo

Kara, Togo


Design-build project for construction of a new three classrooms school building Construction with electrical service connection

Scope of work

Scope of Work consists of, but is not limited to the following deliverables: All work associated with the design and constructions of school buildings, latrines, office blocks, storage rooms, PV systems, Rain Water Harvesting Systems (RWHS), Pavements and As-Built drawings

  • Project Area Current project
  • LocationKara, Togo
  • SectorsConceptual Design
    Electromechanical
An airplane moving through the sky could be the inspiration for the next store design. A lightning storm could inspire the next corporate office design. We designed a building after being moved by the patterns of a butterfly on a leaf. . . Our design philosophy is to be open to our surroundings and the design will find us.