Permanent Power Supply Camp Ramadi

Ramadi, Iraq


This project entails all essential services required to sustain the two 500 man Improved Tented Camps (ITC) to accommodate for the British Army troops.
These services will include Water Supply, Sewerage, Fire Hydrants and Communication Ducts

Scope of work

CDC’s SOW encompasses the Project Management and full Design of a complete Power Station to generate and distribute electricity for all three FOBs at Camp Ramadi.
These FOBs are Ali, Defender, and Phoenix.

  • Project Area Defense
  • Cost USD 23,000,000.00
  • SectorsConceptual Design
    Working Drawings
Whether we're working on a design of an administration building, a chain of restaurants or a healthcare facility, we approach all of our designs with the same excitement. We all enjoy our work and we take great pride in creating not only uniquely different designs but spaces that are functional and profitable.