Camp Notse Primary School Construction

Notse, Togo


Design-build project for construction of two new 3- classroom buildings with office and storeroom, a new 8-stall Ventilated Improved Pit (VIP) latrine building (4 stalls for females/ 4 stalls for males), a new rainwater collection system with four taps for hand washing for each new classroom building, and a new solar power electrical system for each new classroom building in Notse, Togo.

The new classroom buildings and latrine facilities shall be permanent structures utilizing reinforced concrete and CMU block construction methods.
The rainwater collection systems shall collect roof runoff from the new school building and supply water for hand washing.

Scope of work

CDC scope of work was performing and providing electronic design submittals ,Design Analysis for all civil construction works and list the basis of design for all project aspects and features and providing detail plans for any site features constructed or modified, for example walls, manholes, pavements, ramps, and so on, and also for any features special to the nature of the proposed use of the finished site.

  • Project Area Education
  • LocationNotse, Togo
  • SectorsConstruction Documents
    Design Development
    Technical Design
An airplane moving through the sky could be the inspiration for the next store design. A lightning storm could inspire the next corporate office design. We designed a building after being moved by the patterns of a butterfly on a leaf. . . Our design philosophy is to be open to our surroundings and the design will find us.