Cairo, Egypt
Water Treatment Plant (total area of about 40000 m²) consists of 12 construction items including a Pump House, Generator Building, Chemical Building, Underground Water Tanks (800m³ & 1000m³), Administration Building, Warehouses, Workshops, Guard House, and other small constructions.
Scope of work
Construction Development Center team role was to complete the design in all trades, and production of shop drawings for the entire WTP including all the buildings.
We require from buildings two kinds of goodness: first, the doing their practical duty well, then that they be graceful and pleasing in doing it.