Maidan Shehar, Afghanistan
The project designed to accommodate 400 people.
Scope of work
Providing Waste Water Collection System Network Profiles for Waste Water Collection System Structural Drawings for 20 Cubic Meter WW holding tank & platform Structural Drawings for the Pump Station Electrical Cable Size and Panel Bill of Quantities.
We require from buildings two kinds of goodness: first, the doing their practical duty well, then that they be graceful and pleasing in doing it.