Joint Aviation Facility (JAF) Phase I

Kabul, Afghanistan


A Joint Aviation Facility, major components of that project, two hanger shops; one that is meant for four of MI-8 and the other hanger is for one AN12 + two of MI-8 or two for AN12 or four of MI-8 ,a maintenance shop , power plant, fuel storage plant, Well house and a water treatment plant

Scope of work

Accreditation was given to CDC for the design of Architectural, structural, mechanical plumbing and electrical systems.

  • Project Area Defense
  • Cost 22,000,000.00
  • SectorsElectromechanical
    Project Management
    Working Drawings
Whether we're working on a design of an administration building, a chain of restaurants or a healthcare facility, we approach all of our designs with the same excitement. We all enjoy our work and we take great pride in creating not only uniquely different designs but spaces that are functional and profitable.