K2 Base Camp Facilities

Uzbekistan


The project consisting of a concrete apron for Aircrafts parking, waste collection system, expansion of an existing waste water treatment facility & a pre-engineered Metal Building for security & immigration.

Scope of work

The scope of the project entailed the structural design and production of shop drawings for the required construction, in addition to the complete production of construction documents.

  • Project Area Projects
  • Cost USD 12,000,000.00
  • SectorsConceptual Design
    Working Drawings
An airplane moving through the sky could be the inspiration for the next store design. A lightning storm could inspire the next corporate office design. We designed a building after being moved by the patterns of a butterfly on a leaf. . . Our design philosophy is to be open to our surroundings and the design will find us.