4th Division Infantry Battalion

Baghdad, Iraq


.

Scope of work

CDC’s scope of work encompasses:
1. the Project Management and the full range of methods, technologies and supporting activities necessary to design new facilities and infrastructure to remodel and upgrade existing facilities and infrastructure to support the following units:

· 1stLight Infantry Battalion, 1st Brigade, 4th Division IA
· 3rdLight Infantry Battalion, 1st Brigade, 4th Division IA
· 4thLight Infantry, 1st Brigade, 4th Division IA

2. Power Generation Buildings are designed with sunshades at each FOB to house the generators, transformers and switchgear associated with the power production and distribution for the separate FOBs and to protect this gear.

3. The generation area shall have sufficient fuel storage capacity to ensure that the plant can function 5 days without re-fueling.

  • Project Area Defense
  • Cost 25,000,000.00
  • SectorsConceptual Design
    Project Management
    Working Drawings
An airplane moving through the sky could be the inspiration for the next store design. A lightning storm could inspire the next corporate office design. We designed a building after being moved by the patterns of a butterfly on a leaf. . . Our design philosophy is to be open to our surroundings and the design will find us.