Joint Aviation Facility (JAF) Phase I

Kabul, Afghanistan


A Joint Aviation Facility, major components of that project, two hanger shops; one that is meant for four of MI-8 and the other hanger is for one AN12 + two of MI-8 or two for AN12 or four of MI-8 ,a maintenance shop , power plant, fuel storage plant, Well house and a water treatment plant

Scope of work

Accreditation was given to CDC for the design of Architectural, structural, mechanical plumbing and electrical systems.

  • Project Area Defense
  • Cost 22,000,000.00
  • SectorsElectromechanical
    Project Management
    Working Drawings
The exterior cannot do without the interior since it is from this, as from life, that it derives much of its inspiration and character.
Stephen Gardiner