K2 Base Camp Facilities

Uzbekistan


The project consisting of a concrete apron for Aircrafts parking, waste collection system, expansion of an existing waste water treatment facility & a pre-engineered Metal Building for security & immigration.

Scope of work

The scope of the project entailed the structural design and production of shop drawings for the required construction, in addition to the complete production of construction documents.

  • Project Area Projects
  • Cost USD 12,000,000.00
  • SectorsConceptual Design
    Working Drawings
Design is not just what it looks like and feels like. Design is how it works.
Steve Jobs