Herat, Afghanistan
The project consists of the design and construction of a new Afghanistan National Army and related support facilities, Kandak in the vicinity of Qala-e-Naw, Badghis Province, Afghanistan. The site shall have a population of approximately 650 personnel. Required buildings included: List of Items Site Grading, Storm Sewer & Drainage System Water Well, Storage, Booster Pump Facility and Distribution System Sewage Collection & Treatment System Prime Electric Generating Plant and Distribution System Communication Distribution System Force Protection Perimeter Entry Control Points (ECP) Guard Towers Guard Posts COB/Command/Staff OPS Buildings Dining Facility with Canopy Food Storage Facility Refrigerated Storage Enlisted Barracks Officer Barracks NCO Barracks Toilet/Shower/Ablution/Laundry Facility (large) ETT Buildings Vehicle Maintenance Facility Vehicle Fuel Point Ammunition Storage Personnel Bunkers Option items: Helipad Toilet/Shower/Laundry Facility (small) NCO Barracks (one Building) COB/Command/Staff Ops Building (one building) Enlisted barracks Storage Vehicle Maintenance Storage ETT Storage Facility Asphalt Pave Road Network and Parking Areas Concrete Sidewalks USACE Field Office Facility & Service
Scope of work
.
An airplane moving through the sky could be the inspiration for the next store design. A lightning storm could inspire the next corporate office design. We designed a building after being moved by the patterns of a butterfly on a leaf. . . Our design philosophy is to be open to our surroundings and the design will find us.