Perere High School Construction

Perere, Benin


Design-build project for construction of a new four classroom school building with electrical service connection, and a new 8-stall Ventilated Improved Pit (VIP) latrine (4 stalls for females/ 4 stalls for males), in Perere, Benin.

Scope of work

CDC scope of work was performing and providing electronic design submittals ,Design Analysis for all civil construction works and list the basis of design for all project aspects and features and providing detail plans for any site features constructed or modified, for example walls, manholes, pavements, ramps, and so on, and also for any features special to the nature of the proposed use of the finished site.

  • Project Area Education
  • LocationPerere, Benin
  • SectorsConstruction Documents
    Design Development
    Technical Design